| # Project Workflow |
| |
| ## Guiding Principles |
| |
| 1. **The Plan is the Source of Truth:** All work must be tracked in `plan.md` |
| 2. **The Tech Stack is Deliberate:** Changes to the tech stack must be documented in `tech-stack.md` *before* implementation |
| 3. **Test-Driven Development:** Write unit tests before implementing functionality |
| 4. **High Code Coverage:** Aim for >80% code coverage for all modules |
| 5. **User Experience First:** Every decision should prioritize user experience |
| 6. **Non-Interactive & CI-Aware:** Prefer non-interactive commands. Use `CI=true` for watch-mode tools (tests, linters) to ensure single execution. |
| |
| ## Task Workflow |
| |
| All tasks follow a strict lifecycle: |
| |
| ### Standard Task Workflow |
| |
| 1. **Select Task:** Choose the next available task from `plan.md` in sequential order |
| |
| 2. **Mark In Progress:** Before beginning work, edit `plan.md` and change the task from `[ ]` to `[~]` |
| |
| 3. **Write Failing Tests (Red Phase):** |
| - Create a new test file for the feature or bug fix. |
| - Write one or more unit tests that clearly define the expected behavior and acceptance criteria for the task. |
| - **CRITICAL:** Run the tests and confirm that they fail as expected. This is the "Red" phase of TDD. Do not proceed until you have failing tests. |
| |
| 4. **Implement to Pass Tests (Green Phase):** |
| - Write the minimum amount of application code necessary to make the failing tests pass. |
| - Run the test suite again and confirm that all tests now pass. This is the "Green" phase. |
| |
| 5. **Refactor (Optional but Recommended):** |
| - With the safety of passing tests, refactor the implementation code and the test code to improve clarity, remove duplication, and enhance performance without changing the external behavior. |
| - Rerun tests to ensure they still pass after refactoring. |
| |
| 6. **Document Deviations:** If implementation differs from tech stack: |
| - **STOP** implementation |
| - Update `tech-stack.md` with new design |
| - Add dated note explaining the change |
| - Resume implementation |
| |
| 7. **Commit Code Changes:** |
| - Stage all code changes related to the task. |
| - Propose a clear, concise commit message e.g, `feat(ui): Create basic HTML structure for calculator`. |
| - Perform the commit. |
| |
| 8. **Attach Task Summary with Git Notes:** |
| - **Step 9.1: Get Commit Hash:** Obtain the hash of the *just-completed commit* (`git log -1 --format="%H"`). |
| - **Step 9.2: Draft Note Content:** Create a detailed summary for the completed task. This should include the task name, a summary of changes, a list of all created/modified files, and the core "why" for the change. |
| - **Step 9.3: Attach Note:** Use the `git notes` command to attach the summary to the commit. |
| ```bash |
| # The note content from the previous step is passed via the -m flag. |
| git notes add -m "<note content>" <commit_hash> |
| ``` |
| |
| 9. **Get and Record Task Commit SHA:** |
| - **Step 10.1: Update Plan:** Read `plan.md`, find the line for the completed task, update its status from `[~]` to `[x]`, and append the first 7 characters of the *just-completed commit's* commit hash. |
| - **Step 10.2: Write Plan:** Write the updated content back to `plan.md`. |
| |
| 10. **Commit Plan Update:** |
| - **Action:** Stage the modified `plan.md` file. |
| - **Action:** Commit this change with a descriptive message (e.g., `conductor(plan): Mark task 'Create user model' as complete`). |
| |
| ### Phase Completion Verification and Checkpointing Protocol |
| |
| **Trigger:** This protocol is executed immediately after a task is completed that also concludes a phase in `plan.md`. |
| |
| 1. **Announce Protocol Start:** Inform the user that the phase is complete and the verification and checkpointing protocol has begun. |
| |
| 2. **Ensure Test Coverage for Phase Changes:** |
| - **Step 2.1: Determine Phase Scope:** To identify the files changed in this phase, you must first find the starting point. Read `plan.md` to find the Git commit SHA of the *previous* phase's checkpoint. If no previous checkpoint exists, the scope is all changes since the first commit. |
| - **Step 2.2: List Changed Files:** Execute `git diff --name-only <previous_checkpoint_sha> HEAD` to get a precise list of all files modified during this phase. |
| - **Step 2.3: Verify and Create Tests:** For each file in the list: |
| - **CRITICAL:** First, check its extension. Exclude non-code files (e.g., `.json`, `.md`, `.yaml`). |
| - For each remaining code file, verify a corresponding test file exists. |
| - If a test file is missing, you **must** create one. Before writing the test, **first, analyze other test files in the repository to determine the correct naming convention and testing style.** The new tests **must** validate the functionality described in this phase's tasks (`plan.md`). |
| |
| 3. **Execute Automated Tests with Proactive Debugging:** |
| - Before execution, you **must** announce the exact shell command you will use to run the tests. |
| - **Example Announcement:** "I will now run the automated test suite to verify the phase. **Command:** `CI=true npm test`" |
| - Execute the announced command. |
| - If tests fail, you **must** inform the user and begin debugging. You may attempt to propose a fix a **maximum of two times**. If the tests still fail after your second proposed fix, you **must stop**, report the persistent failure, and ask the user for guidance. |
| |
| 4. **Propose a Detailed, Actionable Manual Verification Plan:** |
| - **CRITICAL:** To generate the plan, first analyze `product.md`, `product-guidelines.md`, and `plan.md` to determine the user-facing goals of the completed phase. |
| - You **must** generate a step-by-step plan that walks the user through the verification process, including any necessary commands and specific, expected outcomes. |
| - The plan you present to the user **must** follow this format: |
| |
| **For a Frontend Change:** |
| ``` |
| The automated tests have passed. For manual verification, please follow these steps: |
| |
| **Manual Verification Steps:** |
| 1. **Start the development server with the command:** `npm run dev` |
| 2. **Open your browser to:** `http://localhost:3000` |
| 3. **Confirm that you see:** The new user profile page, with the user's name and email displayed correctly. |
| ``` |
| |
| **For a Backend Change:** |
| ``` |
| The automated tests have passed. For manual verification, please follow these steps: |
| |
| **Manual Verification Steps:** |
| 1. **Ensure the server is running.** |
| 2. **Execute the following command in your terminal:** `curl -X POST http://localhost:8080/api/v1/users -d '{"name": "test"}'` |
| 3. **Confirm that you receive:** A JSON response with a status of `201 Created`. |
| ``` |
| |
| 5. **Await Explicit User Feedback:** |
| - After presenting the detailed plan, ask the user for confirmation: "**Does this meet your expectations? Please confirm with yes or provide feedback on what needs to be changed.**" |
| - **PAUSE** and await the user's response. Do not proceed without an explicit yes or confirmation. |
| |
| 6. **Create Checkpoint Commit:** |
| - Stage all changes. If no changes occurred in this step, proceed with an empty commit. |
| - Perform the commit with a clear and concise message (e.g., `conductor(checkpoint): Checkpoint end of Phase X`). |
| |
| 7. **Attach Auditable Verification Report using Git Notes:** |
| - **Step 8.1: Draft Note Content:** Create a detailed verification report including the automated test command, the manual verification steps, and the user's confirmation. |
| - **Step 8.2: Attach Note:** Use the `git notes` command and the full commit hash from the previous step to attach the full report to the checkpoint commit. |
| |
| 8. **Get and Record Phase Checkpoint SHA:** |
| - **Step 7.1: Get Commit Hash:** Obtain the hash of the *just-created checkpoint commit* (`git log -1 --format="%H"`). |
| - **Step 7.2: Update Plan:** Read `plan.md`, find the heading for the completed phase, and append the first 7 characters of the commit hash in the format `[checkpoint: <sha>]`. |
| - **Step 7.3: Write Plan:** Write the updated content back to `plan.md`. |
| |
| 9. **Commit Plan Update:** |
| - **Action:** Stage the modified `plan.md` file. |
| - **Action:** Commit this change with a descriptive message following the format `conductor(plan): Mark phase '<PHASE NAME>' as complete`. |
| |
| 10. **Announce Completion:** Inform the user that the phase is complete and the checkpoint has been created, with the detailed verification report attached as a git note. |
| |
| ### Quality Gates |
| |
| Before marking any task complete, verify: |
| |
| - [ ] All tests pass |
| - [ ] Code coverage meets requirements (>80%) |
| - [ ] Code follows project's code style guidelines (as defined in `code_styleguides/`) |
| - [ ] All public functions/methods are documented (e.g., docstrings, JSDoc, GoDoc) |
| - [ ] No linting or static analysis errors (using the project's configured tools) |
| - [ ] Documentation updated if needed |
| |
| ## Development Commands |
| * Building: `./gen.py && ninja -C out $TARGETS`, where targets can be `gn` or `gn_unittests` for the tool or the tests respectively. |
| * Running tests: `out/gn_unittests` |
| * It uses a gtest-like framework defined in `util/test/test.h` so you can use standard gtest filters to only run specific tests. |
| |
| ### Setup |
| |
| ## Testing Requirements |
| |
| ### Unit Testing |
| - Every module must have corresponding tests. |
| - Follow existing test styles. |
| |
| ## Code Review Process |
| |
| ### Self-Review Checklist |
| Before requesting review: |
| |
| 1. **Functionality** |
| - Feature works as specified |
| - Edge cases handled |
| - Error messages are user-friendly |
| |
| 2. **Code Quality** |
| - Follows style guide |
| - DRY principle applied |
| - Clear variable/function names |
| - Appropriate comments |
| |
| 3. **Testing** |
| - Unit tests comprehensive |
| - Integration tests pass |
| |
| ## Commit Guidelines |
| |
| ### Message Format |
| ``` |
| <type>(<scope>): <description> |
| |
| [optional body] |
| |
| [optional footer] |
| ``` |
| |
| ### Types |
| - `feat`: New feature |
| - `fix`: Bug fix |
| - `docs`: Documentation only |
| - `style`: Formatting, missing semicolons, etc. |
| - `refactor`: Code change that neither fixes a bug nor adds a feature |
| - `test`: Adding missing tests |
| - `chore`: Maintenance tasks |
| |
| ### Examples |
| ```bash |
| git commit -m "feat(auth): Add remember me functionality" |
| git commit -m "fix(posts): Correct excerpt generation for short posts" |
| git commit -m "test(comments): Add tests for emoji reaction limits" |
| git commit -m "style(mobile): Improve button touch targets" |
| ``` |
| |
| ## Definition of Done |
| |
| A task is complete when: |
| |
| 1. All code implemented to specification |
| 2. Unit tests written and passing |
| 3. Code coverage meets project requirements |
| 4. Documentation complete (if applicable) |
| 5. Code passes all configured linting and static analysis checks |
| 6. Works beautifully on mobile (if applicable) |
| 7. Implementation notes added to `plan.md` |
| 8. Changes committed with proper message |
| 9. Git note with task summary attached to the commit |